Kitchen Progress

The kitchen is pretty much done :-)
Everything we do now feels cosmetic.
I had plans to take some photos yesterday so that I can show you just how much progress we have made... unfortunately the weather decided not to play along. All the photos turned out very dark and doesn't do the kitchen justice. So I'll post some photos later this week.

Here is a list of the remaining things to do:
- paint the wall;
- put up a few shelves;
- build the microwave oven unit and fix it to the wall;
- connect the new oven to the gas and electricity and move it into place;
- put up the extractor unit;
- unpack more all of the boxes filling up my living room.
- paint the last kitchen wall white.
- lay the laminate floor.
- buy skirting boards and put them up.
- build a bookshelf.
- build the pantry.
- build the new ikea cabinet.
- buy a new (or nearly new) radiator.
- paint the door and window frame.
- paint the indoor window cill and fix it to the frame.
- put up a trim on the outside of the new window.
- clean everything in the house.
- remove the floating shelves in the dining area.
- remove and sell the old radiator in the dining area.
- move the light fitting in the dining area and plaster the hole.
- paint the ceiling in the dining area and living room.
- plaster the new wall in the dining area.
- paint the new and old walls near the stairs in the dining area.
- go to the spa.

Once again this week's menu will be randomly decided on a daily basis, all I know for sure is that the new oven is awesome!!


Have a great week!

2 comments:

  1. http://www.izom.co.il/

    Wrote a very interesting and good.
    I learned a lot from it.
    A lot of thanks to you.
    I'd love more content on this subject.

    ReplyDelete

Related Posts Plugin for WordPress, Blogger...